Step 1: Pre-Construction
Contract
Soil test from property (determines proper foundation)
Boundary survey (determines size and boundaries of lot)
Site plan (determines exact location where home will sit on property)
Final decisions made on architectural plans
Foundation and frame engineering
Septic design (if applicable)
Building permit
HOA/ACC submittal/approval
Step 2: Construction
Temporary electricity
Lot preparation/clearing
Building pad laid and tested (for compaction in preparation for foundation)
Water: Tap/Well
Forms set for the foundation
Sewer pipes added
Beams, barriers, post tension, and rebar
Final forms
Inspection
Concrete is poured
Framing
Sheeting, siding, walls, windows and exterior doors
Roof decking, shingles
Plumbing pipes (walls and attic), water heater
HVAC
Electrical wiring
Exterior painting
Exterior brick/stone/stucco/siding
Sheetrock/tape and float
Cabinets
Interior painting
Septic installation (if applicable)
Counter tops and tile
Pour driveway
Install light fixtures and outlets
Flooring (carpet and/or wood)
Final Grade/Code inspection with TRCC elevations
Step 3: Closing
Homebuyer walk-through
Closing and keys
Move-in!